Sam White Bridge | |
---|---|
Carries | Vehicle traffic |
Crosses | Interstate 15 |
Locale | American Fork, Utah |
Owner | Utah Department of Transportation |
Maintained by | Utah Department of Transportation |
Material | Steel, reinforced concrete |
Total length | 354 feet (108 m) |
Width | 76 feet 10 inches (23.42 m) |
Longest span | 177 feet (54 m) |
Number of spans | Two |
Clearance below | 17 feet 3 inches (5.26 m) |
Constructed by | Provo River Constructors |
Construction begin | August 2010 |
Opened | May 2011 (projected) |
|
|
References: [1][2][3] |
The Sam White Bridge is a reinforced concrete and steel overpass beam bridge which crosses Interstate 15 in American Fork, Utah.[1][4] The original bridge had only 14 feet 7 inches (4.45 m) underpass clearance and was named for Sam White, a former homesteader in the nearby city of Pleasant Grove.[1][5] The new bridge has an underpass clearance of 17 feet 3 inches (5.26 m), which exceeds the minimum standard for interstate bridges in the United States.[1]
The new 354-foot, 3.82-million-pound (1.73-million-kg, 1910-short-ton, 1733-tonne) bridge was built on the side of the interstate—500 feet (150 m) from its final location—in order to reduce traffic impact.[6][7] It was then moved into place over a five-hour period using self-propelled modular transporters,[4] finishing the process three hours ahead of schedule.[5] It is the longest two-span bridge to be moved in the Western Hemisphere,[1][4], and the second longest in the world to be moved.[8]
Utah Department of Transportation, state and federal transportation and construction officials from around the United States, as well as some from other countries, were present to view it being moved into place.[7][9][10] An area of a nearby business park was set aside for the public to watch the bridge being moved into place.[8]